Mar 4, 2014: George installing the electrical conduit/picture rail.
Mar 4, 2014: main electrical conduit/picture rail installed
Mar 4, 2014: picture rail experiment
Mar 5, 2014: starting the kitchen installation
Mar 5, 2014: starting the kitchen installation.
Mar 5, 2014: starting to run the conduits for switches and power points.
Mar 5, 2014: conduit and mounting block for light switch next to front door.
Mar 11, 2014: new pump and automatic switching device installed
Mar 11, 2014: new pump installed next to rainwater tank
Mar 17, 2014: waterproofing the bathroom floor and shower recess
Mar 24, 2014: aluminium skirting boards installed
Mar 24, 2014: rainy day tile cutting area
Mar 24, 2014: tiling the barthroom walls
Mar 25, 2014: new electricity meter board on the old house. Import and export meters for the Greeny Flat PV system are top right.
Mar 25, 2014: replacing the main electrical service line to the old house.
Mar 27, 2014: plumbing and electrical chaos.